Nature of Operations and Basis of Presentation (Details) |
9 Months Ended |
|---|---|
|
Sep. 30, 2018
mi
trains
| |
| Sabine Pass LNG Terminal [Member] | |
| Nature of Operations and Basis of Presentation [Line Items] | |
| Number of Liquefaction LNG Trains | trains | 6 |
| CTPL [Member] | |
| Nature of Operations and Basis of Presentation [Line Items] | |
| Length Of Natural Gas Pipeline | mi | 94 |
| X | ||||||||||
- Definition Length Of Natural Gas Pipeline No definition available.
|
| X | ||||||||||
- Definition [Line Items] for Nature of Operations and Basis of Presentation [Table] No definition available.
|
| X | ||||||||||
- Definition Number of Liquefaction LNG Trains No definition available.
|
| X | ||||||||||
- Details
|
| X | ||||||||||
- Details
|