HOUSTON, Nov. 8, 2013 /PRNewswire/ -- Cheniere Energy Partners, L.P. ("Cheniere Partners") (NYSE MKT: CQP) reported a net loss of $98.1 million and $196.9 million for the three and nine months ended September 30, 2013, respectively, compared to a net loss of $51.4 million and $106.8 million for the same periods in 2012, respectively. 

Significant items for the three months and nine months ended September 30, 2013 were $23.8 million and $34.2 million, respectively, compared to $4.0 million and $38.0 million, respectively, for the comparable 2012 periods.   Significant items for the quarter related to development expenses and derivative gains/losses, and for the nine months ended September 30, 2013, significant items also included loss on early extinguishment of debt.  Development expenses were primarily for the liquefaction facilities we are developing through Sabine Pass Liquefaction, LLC ("Sabine Pass Liquefaction") at the Sabine Pass LNG terminal adjacent to the existing regasification facilities (the "Liquefaction Project").  Derivative gains/losses were primarily the result of the change in fair value of Sabine Pass Liquefaction's interest rate derivatives to hedge the exposure to volatility in a portion of the floating-rate interest payments under the four credit facilities.  Loss on early extinguishment of debt was related to Sabine Pass Liquefaction amending and replacing its $3.6 billion credit facility with four credit facilities aggregating $5.9 billion.  

Liquefaction Project Update

We continue to make progress on the Liquefaction Project, which is being developed for up to six natural gas liquefaction trains ("Trains"), each with a design production of approximately 4.5 mtpa.  We have received Federal Energy Regulatory Commission ("FERC") and Department of Energy ("DOE") approvals for Trains 1 through 4, and we have filed all required regulatory applications with the FERC and DOE to develop Trains 5 and 6. 

The Trains are in various stages of development.

  • Construction on Trains 1 and 2 began in August 2012, and as of September 30, 2013, the overall project for Trains 1 and 2 was approximately 45% complete, which is ahead of the contracted schedule.  Based on our current construction, we anticipate that Train 1 will produce LNG by late 2015.
  • Construction on Trains 3 and 4 began in May 2013, and as of September 30, 2013, the overall project for Trains 3 and 4 was approximately 10% complete.  To date, soil stabilization has been completed and pile driving, our next critical path item, is underway.  We expect Trains 3 and 4 to become operational in late 2016 and 2017, respectively.
  • We continue to make progress with the commercialization and development of Trains 5 and 6.  To date, we have completed two LNG sale and purchase agreements ("SPAs") for approximately 3.75 mtpa, in aggregate, of LNG volumes that commence with the start of Train 5 operations.  Annual fixed fee revenues associated with these SPAs are approximately $0.6 billion.  Bechtel has begun the front-end engineering design ("FEED") on Trains 5 and 6, and we have commenced the regulatory approval process.  In September 2013, we filed the complete application with the FERC.  In February 2013 and in April 2013, we filed Free Trade Agreement ("FTA") and non-FTA export applications for LNG volumes under the SPAs with Total Gas & Power North America, Inc. ("Total") and Centrica plc ("Centrica"), respectively.  In September 2013, we filed FTA and non-FTA export applications for LNG volumes for the un-contracted volumes from Train 5 and for all volumes from Train 6.  To date, we have received authorization from the DOE to export LNG volumes to FTA countries under the Total SPA and Centrica SPA.  FTA authorization for the remaining volumes from Train 5 and all volumes from Train 6 as well as non-FTA authorizations for both Trains 5 and 6 are pending.

Liquefaction Project Timeline







Target Date


Milestone


Trains

1 & 2


Trains

3 & 4


Trains

5 & 6


DOE export authorization


Received


Received


T5: Received FTA

Pending Non-FTA


Definitive commercial agreements


Completed 7.7 mtpa


Completed 8.3 mtpa


T5: Completed

T6: 2014


- BG Gulf Coast LNG, LLC


4.2 mtpa


1.3 mtpa




- Gas Natural Fenosa


3.5 mtpa






- KOGAS




3.5 mtpa




- GAIL (India) Ltd.




3.5 mtpa




- Total Gas & Power N.A.






2.0 mtpa


- Centrica plc






1.75 mtpa


EPC contract


Completed


Completed


2015


Financing






2015


- Equity


Completed


Completed 




- Debt commitments


Received


 Received




FERC authorization








- FERC Order


Received


Received


2,015


- Certificate to commence construction


Received


Received




Issue Notice to Proceed


Completed


Completed


2,015


Commence operations


2015/2016


2016/2017


2018/2019


Q3 2013 Results

For the quarter and nine months ended September 30, 2013, Cheniere Partners reported loss from operations of $23.4 million and $38.1 million, respectively, compared to loss of $8.2 million and income of $23.7 million for the respective comparable periods in 2012.  Net operating losses were primarily affected by operating and maintenance expenses and general and administrative expenses.  Increases in operating and maintenance expenses of $15.8 million and $41.7 million for the three and nine months ended September 30, 2013, respectively, compared to the comparable 2012 periods resulted primarily from costs incurred to purchase LNG to maintain the cryogenic readiness of the regasification facilities at the Sabine Pass LNG terminal and for the nine months ended September 30, 2013,  included increases in variable compensation expenses. Increases in general and administrative expenses of $3.3 million and $52.5 million for the three and nine months ended September 30, 2013, respectively, compared to the comparable 2012 periods were primarily due to increased costs incurred to manage the construction of Trains 1 through 4, which resulted from a management services agreement entered into by Sabine Pass Liquefaction, in which Sabine Pass Liquefaction is required to pay a wholly owned subsidiary of Cheniere Energy, Inc. ("Cheniere Energy") a monthly fee based upon the capital expenditures incurred in the previous month for the Liquefaction Project.  For the three and nine months ended September 30, 2013, the costs incurred to manage the construction of Trains 1 through 4 were $35.2 million and $72.9 million, respectively.  These payments are being funded from proceeds received from the Liquefaction Project's equity and debt financings.

2013 Distributions

We estimate that the annualized distribution to common unitholders for fiscal year 2013 will be $1.70 per unit.  We will pay a cash distribution per common unit of $0.425 to unitholders of record as of November 1, 2013, and the related general partner distribution on November 14, 2013. 

Cheniere Partners owns 100 percent of the Sabine Pass LNG terminal located on the Sabine Pass deep water shipping channel less than four miles from the Gulf Coast.  The Sabine Pass LNG terminal has regasification facilities that include existing infrastructure of five LNG storage tanks with capacity of approximately 16.9 billion cubic feet equivalent (Bcfe), two docks that can accommodate vessels with capacity of up to 265,000 cubic meters and vaporizers with regasification capacity of approximately 4.0 Bcf/d.  Cheniere Partners is developing natural gas liquefaction facilities at the Sabine Pass LNG terminal adjacent to the existing regasification facilities (the "Liquefaction Project").  Cheniere Partners plans to construct over time up to six natural gas liquefaction trains ("Trains"), which are in various stages of development.  Each Train is expected to have a design production capacity of approximately 4.5 mtpa.  Cheniere Partners' wholly owned subsidiary, Sabine Pass Liquefaction, LLC ("Sabine Pass Liquefaction"), has entered into lump sum turnkey contracts for the engineering, procurement and construction of Train 1, Train 2, Train 3 and Train 4 with Bechtel Oil, Gas and Chemicals, Inc. ("Bechtel").  Sabine Pass Liquefaction has commenced construction of Train 1 and Train 2 and the related new facilities needed to treat, liquefy, store and export natural gas.  Construction of Train 3 and Train 4 and the related facilities commenced in May 2013.  Sabine Pass Liquefaction recently began the development of Train 5 and Train 6 and commenced the regulatory process in February 2013. Sabine Pass Liquefaction has also entered into six third-party LNG sale and purchase agreements ("SPAs"). The customers include BG Gulf Coast LNG, LLC ("BG") for 5.5 mtpa, Gas Natural Aprovisionamientos SDG S.A. ("Gas Natural Fenosa") for 3.5 mtpa, Korea Gas Corporation ("KOGAS") for 3.5 mtpa, GAIL (India) Ltd. ("GAIL") for 3.5 mtpa, Total Gas & Power North America, Inc. ("Total") for 2.0 mtpa and Centrica plc ("Centrica") for 1.75 mtpa.  In addition, Sabine Pass Liquefaction has entered into an SPA with Cheniere Marketing, LLC ("Cheniere Marketing") for up to 2.0 mtpa of LNG that is produced but not already committed to third parties.  The BG and Cheniere Marketing SPAs commence with the start of Train 1 operations and the Gas Natural Fenosa SPA commences with the start of Train 2 operations.  The KOGAS and GAIL SPAs commence with the start of Train 3 and Train 4 operations, respectively, and the Total and Centrica SPAs commence with the start of Train 5 operations.   Cheniere Partners has placed documentation pertaining to the Liquefaction Project, including the applications and supporting studies, on its website located at http://www.cheniereenergypartners.com.

For additional information, please refer to the Cheniere Energy Partners, L.P. website at www.cheniereenergypartners.com and Quarterly Report on Form 10-Q for the period ended September 30, 2013, filed with the Securities and Exchange Commission.

This press release contains certain statements that may include "forward-looking statements" within the meanings of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. All statements, other than statements of historical facts, included herein are "forward-looking statements." Included among "forward-looking statements" are, among other things, (i) statements regarding Cheniere Partners' business strategy, plans and objectives, including the construction and operation of liquefaction facilities, (ii) statements regarding our expectations regarding regulatory authorizations and approvals, (iii) statements expressing beliefs and expectations regarding the development of Cheniere Partners' LNG terminal and liquefaction business, (iv) statements regarding the business operations and prospects of third parties, (v) statements regarding potential financing arrangements, and (vi) statements regarding future discussions and entry into contracts. Although Cheniere Partners believes that the expectations reflected in these forward-looking statements are reasonable, they do involve assumptions, risks and uncertainties, and these expectations may prove to be incorrect. Cheniere Partners' actual results could differ materially from those anticipated in these forward-looking statements as a result of a variety of factors, including those discussed in Cheniere Partners' periodic reports that are filed with and available from the Securities and Exchange Commission. You should not place undue reliance on these forward-looking statements, which speak only as of the date of this press release. Other than as required under the securities laws, Cheniere Partners does not assume a duty to update these forward-looking statements.

 (Financial Table Follows)

Cheniere Energy Partners, L.P.

Selected Financial Information

(in thousands, except per unit data) (1)




Three Months Ended


Nine Months Ended



September 30,


September 30,



2013


2012


2013


2012

Revenues









Revenues


$

66,646



$

62,429



$

199,052



$

190,160


Revenues—affiliate


800



3,929



2,140



6,973


Total revenues


67,446



66,358



201,192



197,133











Expenses









Operating and maintenance expense


23,553



6,395



52,751



20,063


Operating and maintenance expense—affiliate


6,314



7,711



23,534



14,486


Depreciation expense


14,491



14,489



43,150



43,135


Development expense


1,355



4,229



8,157



35,369


Development expense—affiliate


133



102



1,195



2,365


General and administrative expense


2,718



4,737



8,521



9,235


General and administrative expense—affiliate


42,239



36,871



101,998



48,745


Total expenses


90,803



74,534



239,306



173,398











Income (loss) from operations


(23,357)



(8,176)



(38,114)



23,735











Other income (expense)









Interest expense, net


(52,528)



(43,626)



(134,806)



(130,554)


Loss on early extinguishment of debt






(80,510)




Derivative gain (loss), net


(22,335)



287



55,706



(288)


Other


111



145



873



289


Total other expense


(74,752)



(43,194)



(158,737)



(130,553)











Net loss


$

(98,109)



$

(51,370)



$

(196,851)



$

(106,818)











Basic and diluted net income (loss) per common unit


$

(0.20)



$

0.04



$

(0.01)



$

0.36











Weighted average number of common units outstanding used for basic and diluted net income per common unit calculation


57,079



31,997



53,277



31,449















September 30, 2013


December 31, 2012

Cash and cash equivalents

$

339,895



$

419,292


Restricted cash and cash equivalents

210,076



92,519


LNG inventory

14,158



2,625


Other current assets (2)

59,090



18,687


Non-current restricted cash and cash equivalents

828,360



272,425


Property, plant and equipment, net

5,642,872



3,219,592


Debt issuance costs, net

340,856



220,949


Non-current derivative assets

64,309




Other assets

71,102



19,698


Total assets

$

7,570,718



$

4,265,787






Current liabilities (2)

$

233,878



155,836


Long-term debt, net of discount

5,574,195



2,167,113


Deferred revenue, including affiliate

35,673



36,220


Long-term derivative liability



26,424


Other liabilities (2)

1,209



216


Total partners' capital

1,725,763



1,879,978


Total liabilities and partners' capital

$

7,570,718



$

4,265,787


_____________

(1) Please refer to the Cheniere Energy Partners, L.P. Quarterly Report on Form 10-Q for the period ended September 30, 2013, filed with the Securities and Exchange Commission.

(2) Amounts include transactions between Cheniere Energy Partners, L.P. and Cheniere Energy, Inc. or subsidiaries of Cheniere Energy, Inc.


 

SOURCE Cheniere Energy Partners, L.P.